Environmental & Social Safeguards

Ensuring sustainable and responsible implementation of the Somaliland Food Systems Resilience Project

Introduction

The Environmental and Social (E&S) Safeguards are a core requirement for all World Bank-funded projects, designed to ensure that development initiatives are implemented in an environmentally sustainable and socially responsible manner. These safeguards provide a framework for identifying, assessing, and managing potential environmental and social risks and impacts throughout the project lifecycle.

E&S Safeguards is an important element of theΒ Somaliland Food Systems Resilience Project (SL-FSRP). Given that the SL-FSRP involves interventions in agriculture, livestock production, environmental management, and rural infrastructure, the E&S safeguards provide a structured framework for identifying, assessing, and managing environmental and social risks throughout the project’s implementation. This approach ensures that development gains are achieved sustainably while preserving ecosystems and promoting equitable benefits for all stakeholders.

Β 

Main Objectives

Environmental Sustainability

Ensure that the project is environmentally and socially sound and sustainable

Protection

Protect communities, ecosystems, and cultural heritage from adverse effects of development activities

Risk Management

Reduce and manage adverse impacts and risks associated with the project

Positive Impact

Maximize the positive impacts of the project

Capacity Building

Strengthen the capacity of institutions to manage risks effectively

Stakeholder Engagement

Engage stakeholders and ensure meaningful involvement of APs and other key stakeholders

Environmental and Social Standards

The World Bank's Environmental and Social Framework (ESF) enables the Bank and Borrowers to better manage environmental and social risks of projects and to improve development outcomes.

Environmental and Social Standards (ESS)

The ESS provides a comprehensive framework for identifying and managing environmental and social risks throughout the project lifecycle.

Figure 1: Environmental and Social Standards (ESS) for the World Bank

List of All Environmental and Social Management Plans (ESMPs) and Integrated Pest Management Plan (IPMP) for SL FSRP Project

Approved ESMP for Abdaal Health Post (PDF)
Download
Approved ESMP for Berbera Veterinary Laboratory (PDF)
Download
Approved ESMP for Borama Cereal Market β€” MoAD (PDF)
Download
Approved ESMP for Gumar Health Post (PDF)
Download
Approved ESMP for Higlada Health Post (PDF)
Download
Approved ESMP for Qool-buulale Health Post (PDF)
Download
Approved ESMP for MoAD Office Building (Word)
Download
Approved IPMP for Livestock Treatment β€” MoLRD (PDF)
Download
Approved ESMP for MoECC Zeila Office Rehabilitation (PDF)
Download
Approved ESMP for MoECC Hargeisa Office Rehabilitation (PDF)
Download
Approved ESMP for MoECC Gabiley Office Rehabilitation (PDF)
Download